Employer:    Pars Kimia Construction Services Development Co.

Location:       Sari

Area:            20,000 m2

One of the ideas in the construction design is to use the possibility of lighting on the single side of the passage. As a result, completely transparent layers cover the outer surface, and in front of it, a semitransparent layer of wooden louvres is visible. The cracks of the terrace in the facade also cut the body of the volume, which increases the light-reflecting faces inside the building and increases the visibility from the inside to the outside.